Per shift
documented handover
Photo proof
on every deviation
Seconds
per station to scan
What goes wrong today

Example
The left photo is what you taught ChangeAIQ. The right one is a later scan, with every change boxed and named on the image itself.


What it detects
Open guards, doors and panels are recognised as changed against the standard state.
Objects outside their marked position are flagged so standards hold between audits.
New objects on a station — tools, cups, parts — are spotted before the line restarts.
How it works

Step 1
Photograph each station in its correct, production-ready state.
Step 2
Machines, carts, tools and free floor space are identified and remembered.
Step 3
One photo per station at shift change — takes seconds per area.
Step 4
The next shift starts with a list of deviations and a photo of each one.
In practice
Area
CNC cell 4
Your rule
"Alert me if a machine panel is open at shift end"
Alert
Panel door open on CNC cell 4 at 22:03.
Area
Assembly bench 2
Your rule
"Alert me if tools are missing from the bench"
Alert
Torque wrench missing from bench 2.
Area
Line walkway
Your rule
"Alert me if anything is parked in the walkway"
Alert
Cart blocking walkway near station 7.